05jp_wr
New Member
- Location
- Syracuse, ut
I have never used still in box Detroit full time locker 30 spline, install kit and hardened g2 axle shafts for a Dana 44 that came out of a jku sport decided to go a different route with my build looking to get rid of everything
Detroit locker with install kit- 1000
Hardened g2 shafts- 300
Detroit locker with install kit- 1000
Hardened g2 shafts- 300