Made a little progress on the forward control this week. Got the cab off the Jeep and was able to get a ton of work/ parts replaced on the motor. Lots of repairs still to do from PO. Anyone recommend someone who can do metal work? I need to have some work done on the cab windshield frame and have it repaired.