Originally posted by cruiser
plate for signs:
poles for signs:
cement:..........................ME!!!
cutting of plate:
welding:
painting of plate:
people to bring water to trails:
wheelbarrel:
shovels, picks,hoes, ect, ect:
We don't have a "planned" date but I have suggested 9/20/03 or the week after 9/27/03, that gives us plenty of time for the construction...
2 1/8" plates: James K will purchase
2 3/8" plates: Hickey already has
Delivery to shop:
Ollie
2 Poles: OCNORB possibly has.
Cutting: )CNORB has volunteered
Welding: Rockmonkey/Others
Painting: Rockmonkey/Others
Water: Skyetone 30 gallons is enough
Holes: EZ has an auger, we will all bring shovels...
So our next step is top get the 1/8" plate to OCNORB for cutting... we will need at least two peices od 3'x3' 1/8" plate. That will gove OCNORB plenty of room.
We will then take the cut signs and trim them to their final size, compare them against the 3/8" that Hickey has and possibly buy one more peice of 3/8" (if Hickeys is only enough for one).
So
James K, is it possible for you to get some 1/8" before the Wednesday after Labor Day (the day OCNORB thinks he can cut them).
Ollie is it possible for you to pick up the plate from James K (he lives near you) and run it to OCNORB while making your daily deliveries?